Abstract
FUJIWA DENKI CO., LTD. (in the Oharu Plant) plans and designs and arranges the various parts that have been gathered at the Toyokawa Plant (in Sintokogio Toyokawa Plant), and assembles them into an Automatic Pouring Device, a Metal Transfer Device, etc. for trial run adjustment.
In addition, we are also assembling the control device and conducting a current inspection that is close to the actual operating situation.
As a feature, we set up a simulated frame for no-load operation, and we also perform a running-in operation for more than 24 hours for the Automatic Pouring Device to provide high-quality equipment that customers can use with peace of mind.
|
|
|